Fibrelite Boats

“We ensure the work is completed thoroughly, cost effectively and beautifully, to the highest of standards.”

  • About Fibrelite Services
  • Boat Repairs
    • Image Gallery
  • Boat Refits & Fit Outs
    • Image Gallery
  • Boat Maintenance
    • Image Gallery
  • Boat Detailing & Cleaning
    • Image Gallery
  • Marine Accessories
    • Image Gallery
  • Industrial & Commercial Services
    • Image Gallery
  • Contact Us
  • Haines Hunter 243 L circa 1970 as delivered to Fibrelite Boats for a complete refit.

    Haines Hunter 243 L circa 1970 as delivered to Fibrelite Boats for a complete refit.

  • Rotten underfloor structure removed, transom repaired; hull prepared for new laminate.

    Rotten underfloor structure removed, transom repaired; hull prepared for new laminate.

  • Transverse and longitudinal under floor structure rebuilt Haines Hunter 243 L circa 1970.

    Transverse and longitudinal under floor structure rebuilt Haines Hunter 243 L circa 1970.

  • Fairing the custom built wheel house.

    Fairing the custom built wheel house.

  • Trial fit of the wheelhouse.

    Trial fit of the wheelhouse.

  • Filling and fairing modified coamings.

    Filling and fairing modified coamings.

  • Completing transom modifications to suit new motor and leg.

    Completing transom modifications to suit new motor and leg.

  • Custom built exhaust system installation and wet faced transducer housing.

    Custom built exhaust system installation and wet faced transducer housing.

  • Fuel system and Yanmar engine fitted. (Floor is temporary work platform)

    Fuel system and Yanmar engine fitted. (Floor is temporary work platform)

  • Preparing boat for painting.

    Preparing boat for painting.

  •  Refit completed,

    Refit completed,

  • Performance excellent!

    Performance excellent!

  • Randell 54 - Fitting stern thruster, antifouling, appliaction of Propspeed.

    Randell 54 - Fitting stern thruster, antifouling, appliaction of Propspeed.

  • Custom made aft canopy with dinghy cradle.  fitted to a Randell 54

    Custom made aft canopy with dinghy cradle. fitted to a Randell 54

  • Installation of a Fibrelite Security Cowling.

    Installation of a Fibrelite Security Cowling.

  • Furuno FCV 295 display, fitted to a Fibrelite anti theft cowling, and a FurunoTZT L12 installed by Fibrelite into a Stabicraft.

    Furuno FCV 295 display, fitted to a Fibrelite anti theft cowling, and a FurunoTZT L12 installed by Fibrelite into a Stabicraft.

  • Furuno 2kw 38hz transducer and a Furuno 2kw 200hz transducer in Fibrelite fairings  complete the elecronics package installed by Fibrelite.

    Furuno 2kw 38hz transducer and a Furuno 2kw 200hz transducer in Fibrelite fairings complete the elecronics package installed by Fibrelite.

  • Custom designed, and built by Fibrelite Boats, exhaust system for a Thomascraft 45

    Custom designed, and built by Fibrelite Boats, exhaust system for a Thomascraft 45

  • Stingray Narine 6.5 mtr fully fitted out by Fibrelite Boats

    Stingray Narine 6.5 mtr fully fitted out by Fibrelite Boats

  • Simrad NSS 12 & NSS 9 coupled with a V169 tilted element 1kw transducer comprise the electronics package fitted by Fibrelite.

    Simrad NSS 12 & NSS 9 coupled with a V169 tilted element 1kw transducer comprise the electronics package fitted by Fibrelite.

  • Stingray fitout by Fibrelite Boats.

    Stingray fitout by Fibrelite Boats.

  • Spacesailer  27 at the begining of a refit project.

    Spacesailer 27 at the begining of a refit project.

  • Saloon before refit Spacesailor 27

    Saloon before refit Spacesailor 27

  • Replacing elecrical system as part of refit.

    Replacing elecrical system as part of refit.

  • Saloon after refit Spacesailor 27.

    Saloon after refit Spacesailor 27.

  • Refit project completed Spacesailor 27

    Refit project completed Spacesailor 27

  • Severly damaged 57' Lagoon Catmaran requires replacement starboard hull and other extensive repairs.

    Severly damaged 57' Lagoon Catmaran requires replacement starboard hull and other extensive repairs.

  • Outboard side of replacement hull completed;  work underway building a mould for the inboard side of the hull.

    Outboard side of replacement hull completed; work underway building a mould for the inboard side of the hull.

  • Core being laid over outer laminates.

    Core being laid over outer laminates.

  • Preparing to vacuum infuse replacement inboard hull  side

    Preparing to vacuum infuse replacement inboard hull side

  • Leaving the Fibrelite factory to be joined to a 57ft Lagoon catamaran on our hard standing.

    Leaving the Fibrelite factory to be joined to a 57ft Lagoon catamaran on our hard standing.

  • Replacment hull section being carefully positioned.

    Replacment hull section being carefully positioned.

  • Replacement inbord hull side positioned ready for trimming and fitting.

    Replacement inbord hull side positioned ready for trimming and fitting.

  • Bridgedeck and starboard inboard hull side fitted .

    Bridgedeck and starboard inboard hull side fitted .

  • The long process of laminating and intergrating the side of the starboard hull and bridge deck underway.

    The long process of laminating and intergrating the side of the starboard hull and bridge deck underway.

  • The first stage of joining the starboard side of the hull to the bridge deck nearing completion.

    The first stage of joining the starboard side of the hull to the bridge deck nearing completion.

  • Manouvering the outboard side of the replacement hull into position.

    Manouvering the outboard side of the replacement hull into position.

  • Both sides of the replacement hull ready for final alignment.  
Project on hold whilst owner  recovers from an accident.

    Both sides of the replacement hull ready for final alignment. Project on hold whilst owner recovers from an accident.

  • Final finish to spar box mould.

    Final finish to spar box mould.

  • Spar boxes prior to installation on a Mondo Marine L5

    Spar boxes prior to installation on a Mondo Marine L5

  • One of the two spar boxes built and fitted to a Mondo Marine S5 by Fibrelite Boats.

    One of the two spar boxes built and fitted to a Mondo Marine S5 by Fibrelite Boats.

  • Nearing completion of a transom rebuild Cobia 580

    Nearing completion of a transom rebuild Cobia 580

  • Refit well under way with the modifications to the  wind shield and dash nearing completion

    Refit well under way with the modifications to the wind shield and dash nearing completion

  • Helm station refit  completed;Cobia 580.

    Helm station refit completed;Cobia 580.

  • Cobia 580 refit completed.

    Cobia 580 refit completed.

  • Chivers  Safari  circa 1970 arrives at Fibrelite for a fit-out and repaint

    Chivers Safari circa 1970 arrives at Fibrelite for a fit-out and repaint

  • Chivers new helm station, cockpit widows and hard top roof.

    Chivers new helm station, cockpit widows and hard top roof.

  • Chivers Safari, circa 1970, refitted.

    Chivers Safari, circa 1970, refitted.

  • Start of the project to repaint and slightly modify a Swarbrick designed yacht.

    Start of the project to repaint and slightly modify a Swarbrick designed yacht.

  • Back on the water  repainted.

    Back on the water repainted.

  • Petersen 30 at the beginning of a repainting and upgrading project.

    Petersen 30 at the beginning of a repainting and upgrading project.

  • Petersen 30 back in the water.

    Petersen 30 back in the water.

  • Installing custom made composite insulation panels to the deck head, bulkheads and ships sides of a trawler's fish processing area.

    Installing custom made composite insulation panels to the deck head, bulkheads and ships sides of a trawler's fish processing area.

  • Installation completed panels manufactured and installed by Fibrelite.

    Installation completed panels manufactured and installed by Fibrelite.

  • Transporting and hardstanding, 50' Schionning Catamaran after completing fit-out

    Transporting and hardstanding, 50' Schionning Catamaran after completing fit-out

  • Saloon roof beginning of refit project SS34

    Saloon roof beginning of refit project SS34

  • Repaired and repainted deck SS34

    Repaired and repainted deck SS34

  • SS34 back in her pen after refit.

    SS34 back in her pen after refit.

  • Trans-ocean rowing boat after refit and repaint, prior to successful Fremantle to Mauritius journey, congratulations to Roz Savage

    Trans-ocean rowing boat after refit and repaint, prior to successful Fremantle to Mauritius journey, congratulations to Roz Savage

  • Starting point for fit out - Schionning 45' Catamaran

    Starting point for fit out - Schionning 45' Catamaran

  • Galley Schionning 45' catamaran.

    Galley Schionning 45' catamaran.

  • Completed saloon 45' Schionning catamaran.

    Completed saloon 45' Schionning catamaran.

  • Repair and refit, 70' Randell Launch ‘Manitoba’ (Circa 1965) saloon being rebuilt

    Repair and refit, 70' Randell Launch ‘Manitoba’ (Circa 1965) saloon being rebuilt

  • Repair and refit, 70' Randell Launch ‘Manitoba’ (Circa 1965) replacement of saloon roof under way

    Repair and refit, 70' Randell Launch ‘Manitoba’ (Circa 1965) replacement of saloon roof under way

  • New wheelhouse under construction refit 70' Randell Launch ‘Manitoba’ (Circa 1965)

    New wheelhouse under construction refit 70' Randell Launch ‘Manitoba’ (Circa 1965)

  • 70' Randell Launch ‘Manitoba’ (Circa 1965) refit nearing completion

    70' Randell Launch ‘Manitoba’ (Circa 1965) refit nearing completion

  • Refit completed ‘Manitoba’ back in her pen

    Refit completed ‘Manitoba’ back in her pen

« Prev Next »

    Web design by Considerate Design | Built by Finely Sliced | © Copyright Fibrelite Boats 2012