Haines Hunter 243 L circa 1970 as delivered to Fibrelite Boats for a complete refit.
Rotten underfloor structure removed, transom repaired; hull prepared for new laminate.
Transverse and longitudinal under floor structure rebuilt Haines Hunter 243 L circa 1970.
Fairing the custom built wheel house.
Trial fit of the wheelhouse.
Filling and fairing modified coamings.
Completing transom modifications to suit new motor and leg.
Custom built exhaust system installation and wet faced transducer housing.
Fuel system and Yanmar engine fitted. (Floor is temporary work platform)
Preparing boat for painting.
Refit completed,
Performance excellent!
Randell 54 - Fitting stern thruster, antifouling, appliaction of Propspeed.
Custom made aft canopy with dinghy cradle. fitted to a Randell 54
Installation of a Fibrelite Security Cowling.
Furuno FCV 295 display, fitted to a Fibrelite anti theft cowling, and a FurunoTZT L12 installed by Fibrelite into a Stabicraft.
Furuno 2kw 38hz transducer and a Furuno 2kw 200hz transducer in Fibrelite fairings complete the elecronics package installed by Fibrelite.
Custom designed, and built by Fibrelite Boats, exhaust system for a Thomascraft 45
Stingray Narine 6.5 mtr fully fitted out by Fibrelite Boats
Simrad NSS 12 & NSS 9 coupled with a V169 tilted element 1kw transducer comprise the electronics package fitted by Fibrelite.
Stingray fitout by Fibrelite Boats.
Spacesailer 27 at the begining of a refit project.
Saloon before refit Spacesailor 27
Replacing elecrical system as part of refit.
Saloon after refit Spacesailor 27.
Refit project completed Spacesailor 27
Severly damaged 57' Lagoon Catmaran requires replacement starboard hull and other extensive repairs.
Outboard side of replacement hull completed; work underway building a mould for the inboard side of the hull.
Core being laid over outer laminates.
Preparing to vacuum infuse replacement inboard hull side
Leaving the Fibrelite factory to be joined to a 57ft Lagoon catamaran on our hard standing.
Replacment hull section being carefully positioned.
Replacement inbord hull side positioned ready for trimming and fitting.
Bridgedeck and starboard inboard hull side fitted .
The long process of laminating and intergrating the side of the starboard hull and bridge deck underway.
The first stage of joining the starboard side of the hull to the bridge deck nearing completion.
Manouvering the outboard side of the replacement hull into position.
Both sides of the replacement hull ready for final alignment. Project on hold whilst owner recovers from an accident.
Final finish to spar box mould.
Spar boxes prior to installation on a Mondo Marine L5
One of the two spar boxes built and fitted to a Mondo Marine S5 by Fibrelite Boats.
Nearing completion of a transom rebuild Cobia 580
Refit well under way with the modifications to the wind shield and dash nearing completion
Helm station refit completed;Cobia 580.
Cobia 580 refit completed.
Chivers Safari circa 1970 arrives at Fibrelite for a fit-out and repaint
Chivers new helm station, cockpit widows and hard top roof.
Chivers Safari, circa 1970, refitted.
Start of the project to repaint and slightly modify a Swarbrick designed yacht.
Back on the water repainted.
Petersen 30 at the beginning of a repainting and upgrading project.
Petersen 30 back in the water.
Installing custom made composite insulation panels to the deck head, bulkheads and ships sides of a trawler's fish processing area.
Installation completed panels manufactured and installed by Fibrelite.
Transporting and hardstanding, 50' Schionning Catamaran after completing fit-out
Saloon roof beginning of refit project SS34
Repaired and repainted deck SS34
SS34 back in her pen after refit.
Trans-ocean rowing boat after refit and repaint, prior to successful Fremantle to Mauritius journey, congratulations to Roz Savage
Starting point for fit out - Schionning 45' Catamaran
Galley Schionning 45' catamaran.
Completed saloon 45' Schionning catamaran.
Repair and refit, 70' Randell Launch ‘Manitoba’ (Circa 1965) saloon being rebuilt
Repair and refit, 70' Randell Launch ‘Manitoba’ (Circa 1965) replacement of saloon roof under way
New wheelhouse under construction refit 70' Randell Launch ‘Manitoba’ (Circa 1965)
70' Randell Launch ‘Manitoba’ (Circa 1965) refit nearing completion
Refit completed ‘Manitoba’ back in her pen